Mont Vert Grande community of 2 and 3 BHK apartments on Pashan-Sus road, near Sai Chowk in Pashan.This residential complex consists of completed and sold out buildings A, B, C and E.
Mont Vert Grande is a project of 5+ acres consisting 4 towers of existing community of 240+ flats in Pashan. Proposed buildings G and D are now open for sale. Building G consists of 10 residential floors of 2 BHK. It also has 2 commercial floors with 13 shops and 10 offices. Building D ia planned as 15 residential floors of 3 BHK.
MahaRERA registration number is: ​ P52100020690 for Bldg D and P52100020880 for Bldg G available at website: http://maharera.mahaonline.gov.in
2BHK & 3BHK
Kitchen
Granite kitchen platform with stainless steel sink
Kitchen dado tiles affixed up to 600 mm above kitchen platform
Power, plumbing and drainage provision for washing machine
Bathrooms
Ceramic floor tiles in bathrooms
Hot-Cold mixer for shower area
Exhaust fan provision in bathrooms (fans not included)
Flooring and wall finish
600mm x 600mm vitrified (soluble salt single charge) flooring for entire flat (excluding bathrooms & terrace/s)
OBD paint (Oil bound distemper)
Gypsum finish internal walls
Doors
Flush door with laminate on both sides
Bathroom door frames in granite
Cylindrical lock for internal doors
Windows
Aluminum windows with mosquito net (Mosquito net is a courtesy item and no warranty for mosquito nets)
Terrace
Ceramic flooring for attached terrace/s
Telephone and TV
Intercom facility in living room (One point)
TV/Cable point for living room and master bedroom
Electrical
15A power point for split air-conditioner for bedrooms and living room
Each flat with ELCB (earth leakage circuit breaker) for electrical safety
Three phase power supply
Inverter back-up provision (inverter not included)
Elevator
Two automatic elevators
Back-up power generator for elevators & common lighting
Security
CCTV Camera in common area
Fire Fighting
PMC compliant fire-fighting equipment and refuge area
Water connection
Connection to existing PMC water supply lines as per PMC norms
Centralized water softening plant (operational if PMC water is not available)
In case PMC water is not available allottee / Society will pay for the water from alternate sources
Ecoâ€friendly features
Common Solar water heating system (operational for specific timings) with one outlet in only one bathroom as decided by the promoter
Rain water harvesting
Effluent Treatment Plant for water conservation
Construction:Under Construction
Possession:Tower D - 31/12/2023 / Tower G - 30/04/2023
Airport: 20 Km.
School: 1 Km.
Hospital: 1 Km.
Market: 1 Km.
Railway Station: 15 Km.
Address:
City: Pune
State/Country: Maharashtra
Country: India
Amar Builders Amar Serenity Baner Pashan Link Road Pune 3BHK Price Location Floor Plan Amenities
Baner Pashan Link Road, Pune